my dear friends in this bolog iam going to write about motor grader manual,
control and operations indeed your,s attention this manual contains the
necessary safety information and
operating instructions for the correct
operation of this machine hopefull to
ensure you observeing and following the local
rules and laws when you operate this
machinery semi motor grader is used to
melly for road construction water
conservancy construction farmland
improvement airport construction mining
national defense projects in the case of
'as the key points of startup
and operation the key points of the
startup before starting the engine the
operator should make an overall check of
the equipment first o of all make sure the
power switch is turned on the
transmission control switch in a neutral
position the parking brake in a stop
position then check the engine oil level
the engine coolant level the hydraulic
oil level the fuel level the future of
engine the tire pressure and all the
fastening bolts the pipe lines and
cables before you start the machine the
operator shall perform a walk-around
inspection in order to ensure that there
is no one around the machine and then
beep the horn to alert everyone around
equipment insert the key into ignition
switch rotate to one bit check all the
lives in all of instrument display is
normal
rotate the ignition switch to three bit
when engine starts up immediately
release the key attention one to avoid
ignition switch damaged its key turns a
star the engine should not be more than
10 seconds if the engine does not start
up rotate the switch to off position
wait 30 seconds and try again ,if you
did not switch on over three times in
order to protect the battery every key
turn should not exceed two minutes of
continuous ignition 3 when the engine
temperature is low after initial startup
avoid any high revving operation for the
gear slackers to be in a neutral
position before startup otherwise engine
cannot be started five before turning
off the engine the operator needs to let
the engine idle for 2 to 7 minutes to
let the engine cool down before the
driving the machine must meet the
following conditions one raised all of
the implements that is the mode board
the dozer blade and the real Reaper to
turn the parking switch to on three
adjust the gear selector to forward or
backward according to the road condition
and driving direction the key points for
operating the implements the following
introduces the operation matters of the
mode board the dozer blade and the real
Reaper firstly an introduction for all
the operation methods of the mode board
the key points of the mode board to roll
over
the left is an example step one the
piston rod is fully retracted by
operating the right lift two cylinder
joystick step to the piston rod is
extended out to the maximum via
prettiness wing cylinder joystick step 3
adjust the mode board rotation joystick
for the ring gear to enable the plate in
for frame to form angle of 50 to 60
degree step for adjust joystick to
extend the blade out to the maximum of
the left step 5 adjust the left it'll
lift a cylinder joystick to extend the
piston rod slowly to enable the outside
of blade to grant soft way step 6 using
Lok ping cylinder switched located on
the control console withdraw the piston
of Lok ping cylinder from the supporting
whole of swing frame step 7 adjusted
left to lift a slender joystick to
extend a piston rod slowly in a rotating
frame to enable the piston of lock paint
cylinder and the relevant supporting
whole of swing frame to align step 8
using the same lock paint cylinder
switch insert the piston of Lok ping
slender into the relevant and supporting
home of swing frame step 9 move the
traction frame to the position will be
flat in operate the blade lift slender
to enable the incline angle of blade in
accordance with ramps lobes
are pretty on the general flat working
environment insert the Lok ping cylinder
position third hole on a swing frame in
a counter White's direction the swing
frame should insert into the left or
right relevant supporting hole when the
mood board is required on the left or
right side attention only once the mood
board is touching ground can switch Ford
lock paint slender the operation key
points for constructing a smooth riding
road as follow step one set mood boards
enable the shoveled soil to be pushed
out to the right or left to wale
accordingly step two set both board
horizontel ways achieve the cutting
depth leaning wills in order to offset
drift and increase the stability of the
machine step 3 according to the soil
adjust the elevation of mood board to
this suitable angle and height step 5
the soil is paved evenly on the road
until the road smoothness is achieved
when operating on s-band the machine is
turned to the direction of the band and
the mood board is moved in the opposite
direction when operating on the step
slope between 10 to 15 degree the
machine should be operated in the first
year speed and at low engine revs when
the mood board is existing from a steep
slope or ditch the operator needs to
stop using the machine lift or
implements and slowly retreat after the
frame is located on the center of the
road away from the steep slopes or
ditches the operator must turn front
wheels to the direction of a savory
treat
then operator must have continued its
retreat until the back on the machine is
out of the steep slopes or ditches the
key points for cleaning the road
shoulders as followed step one according
to the mold horde rollover action adjust
the swinging rack position step to the
left point of the blade must be placed
to a liar with a front left attire age
the soil material must be discharged
between the two wells step 3 put down
the mode board and keep it in horizontal
position then lower the mode board to
the required depth of the cutting step 4
adjust for later incline the front
wheels to the right the key points of
scrapping the channel are as follow step
one as per the mode board rollover
method but just a swinging rack position
to make Lok ping cylinder position in
suitable hole on the swing frame step to
position the front right whale in the
bottom village step 3 position the mood
board to place the front cutter blade on
a track of the left of front wheel to
achieve required wife in a single
cutting step 4 adjust the mood board
down and lower it to the required depth
of cutting step 5 lifted the mood board
and adjusted to the slope of the road
shoulder step 6 incline the front wheels
to the right step 7 when cutting Vidic
for the second time the operator needs
to make the dabs slightly higher or a
code to first time step 9 level the
mound of soil before completing the work
the key points to cleaning a side
channel eyes followed step one as per to
demote boy roll over method the Justice
waning rack position step to the left
point of the blade must be placed in
line with a back of left to whale step 3
adjust the moat wore down and lower it
to the required depth of cut in step 4
position the right end of the moat board
to pile up to soil between the two
wheels step 5 incline the front wheels
to the right step 6 the operator needs
to scrap once more to discharge the soil
material on the slope in shoulder
they'll level the soil before completing
the work the key points of scrapping wet
edge are as followed
step one turn the Machine so the front
wheels and mode board are all in the
ditch and used to front wheel steering
stab to the mud and soil in the ditch
we'll make the wheel slip but for
keeping the real wheels on the shoulder
of the road for better traction we have
now completed introduction for the mood
board operation methods we will now
introduce the operation methods for
Reaper attention when operating Reaper
the greater body must be aligned
straight when turning on the grade you
must lift a Reaper to avoid damage to
the cutting teeth the big teeth of the
Reaper armilla used for the hardest oil
conditions in small teeth are used for
software soil conditions when driving
straight you can adjust the operating
joysticks to control the tabs of the
river in soil according to the site and
soil conditions adjust the speed to
match the workload the op return is to
lift a Reaper to the highest position
after the work is completed lastly we
will introduce the operation methods for similarly
the dozer blade the operator can adjust
a joystick to control the change of the
depths of dozer blade for the best
effects try and keep the blade parallel
with the ground just to allow the blade
to fill with soil attention when
operating the dozer blade do not shove
all too deep or this will overload the
machine and it comes to driving wheels. next hopefully you enjoy to read this bolog related to quarry and construction machinery. moreever visit to the ,,qaisrani240.bologspot.com